<kbd id="qqge6"></kbd>
  • <menu id="qqge6"><th id="qqge6"></th></menu>
  • <pre id="qqge6"></pre>
    天天干曰,国产成人久久精品激情,久久丫精品系列,国产成人午夜精华液,国产精品丝袜高跟鞋,亚洲精品久久久口爆吞精,国产熟妇乱子伦视频在线观看,国产成人精品综合久久久

    80 Ton Press Machine Trial

    Category: Video

    This line shown in video is for the production of side body of metal electrical box, composed of one set of 80 ton c frame single crank press, one progressive die, one set of auto feeding equipments. The installation and adjustment of the die must be particularly careful as the die is high cost and weight especially for a large and medium-sized die. The safety of the person should always be put in the first place.

    The general procedures of mold and machine trial:

    1. Adjust the die height. According to the height of the trial mold, adjust the press slider to the appropriate height, the speed should be gentle and uniform, otherwise the slider gap will be caused. After adjusting the die height, be sure to lock and adjust the fixed screws.
    2. Mount the mold. Raise the press slider to the top dead center, put into the mold, align the shank with the fixing hole of the slider, and move down the slider until the gap with the mold is about 3~5mm. The distance difference of the mold from press working table at both sides shall be within 0.1mm measured by vernier caliper. Then, move down the slider to the bottom dead center to see if the mold is completely closed. If the upper and lower limit blocks are not completely closed (the upper and lower limit blocks should be in the fitted state when the mold is closed), the mold height needs to be re-adjusted. After proper adjusting, tighten the fixing screws of upper and lower mold.
    3. Put the receiver and place waste bins and other accessories.

    Precautions:

    1) It is strictly forbidden to reach into the mold for any operation during machine running. When the hand needs to reach into the mold for operation, it must be confirmed that the motor has completely stopped and the safety pad has been put into the mold before operation;
    2) It is strictly forbidden to operate the press and die by two persons at the same time (including during demonstration, guidance, adjustment, material leading and operation);
    3) It is not allowed to set press in a continuous mode when leading materials for subsequent continuous stamping.

    Previous
    25 Ton Press Machine
    Next
    300 Ton Press Progressive Stamping

    View More

    主站蜘蛛池模板: 国产xxxxxxx| 亚洲国产精品久久人人爱| 超碰日日夜夜| 金典亚洲经典av| 精品无码av无码免费专区| 亚洲国产av剧一区二区三区| 亚洲熟妇AV乱码在线观看| 国产19p| 亚洲成av人片天堂网无码| 亚洲综合av在线在线播放| 亚洲在线| 久久无码喷吹高潮播放不卡| 上司的丰满人妻中文字幕| 成人在线综合| 在线观看国产精品日韩av| 老女人丨91丨九色| 婷婷五月色| 91在线观看| 97视频在线播放| 亚洲色图自拍| 国产AV一区二区三区| 午夜精品偷拍| 老熟妇一区二区三区啪啪| 国产精品免费无遮挡无码永久视频| 国产精品亚洲综合色区韩国| 91露脸熟女对白不带套| 少妇天堂久久性| 欧美不卡一区二区三区| 成人视频网站在线观看18| 91色在线| 免费国产va| 亚洲性视频| 国产美女精品一区二区| 亚洲成老女av人在线视| 日本精品中文字幕在线不卡| 呦视频在线一区二区三区| 久久99精品中文字幕在| 欧美a视频| 狼友看片| 成人网站18禁| 欧美日视频|